IP-04 Solvent-Free Polyurea Primer
Solvent-Free Polyurea Primer, Zero VOC Primer, Concrete Floor Primer, Industrial Floor Coating, High Adhesion Primer, IP-04 Primer
Product Info
IP-04 Solvent-Free Polyurea Primer: Superior Foundation for Industrial Polyurea spray coating and flooring.
IP-04 is an advanced two-component, zero-VOC polyurea primer engineered for maximum concrete adhesion and surface penetration. This solvent-free formula eliminates toxic emissions and irritating odors, making it safe for confined spaces while providing exceptional sealing performance.
Key Features
✅ 100% Solvent-Free & Zero VOC: Safe for indoor/outdoor use with no harmful emissions
⚡ Fast Curing: Surface dry ≤6 hours, full cure ≤24 hours (25°C/60% RH)
🔗 Exceptional Adhesion: ≥2.5MPa pull-off strength on concrete substrates
🕒 Work-Friendly Pot Life: 40-60 minute open time for seamless application
💧 Deep Penetration: Low-viscosity formula seals porous surfaces effectively
🛡️ Superior Sealing: Creates optimal substrate for topcoat systems
♻️ Environmentally Compliant: No volatile organic compounds
The X-8586 polyurea hard coating is ideal for:
• Industrial workshop floors
• Garage & parking lot coatings
• Stadium seating & sports arenas
• Swimming pool surrounds
• Warehouse flooring systems
• Chemical storage tanks
• High-traffic commercial floors
Technical Parameters
Physical Properties:
Component A: Colorless/slight yellow liquid | Density: ~1.0 g/ml | Viscosity: ≤1000 mPa•S
Component B: Brown liquid | Density: 1.10-1.60 g/ml | Viscosity: ≤1000 mPa•S
Mix Ratio: 2:1 by weight (A:B)
Coverage: 0.15-0.2kg/m² (roller), 0.2-0.3kg/m² (spray) at 0.1mm DFT
Flash Point: 150°C (Component A)
Performance Data:
Working Time: ≤24 hours
Recoat Window: After full cure confirmation
Application Temp: 5-35°C
Humidity Range: 30-80% RH
Application
Surface Prep: Clean, dry concrete (≥5°C above dew point)
Mixing: Blend Component A + B at 2:1 ratio until homogeneous
Methods:
Airless spray (recommended for large areas)
Roller coating
Brush application (small repairs)
Curing: Allow ≤6h for surface dry before light foot traffic